AMPHORA Ready Instructions de montage - Page 2

Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} AMPHORA Ready. AMPHORA Ready 4 pages.

10)
Place the front arch on the front plate of the bottom.
Then bolt the smoke guard to the arch. Do not
tighten the joints too firmly, otherwise the damage of the
refractory shapes may occur due to heat dilatation.
15)
Cover the assembled arch with at least 1 layer of
aluminium foil I8. Place the isolation bio-mat on the
aluminium foil according to the cutting plan for the
bio-mat. Make sure the bio-mat doesn't get distorted
during the application.
19)
11)
Place the rear arch
and rear arch. Side arches should be placed with a hole
on the rear plate of the bottom.
16)
Place the front parts T9 and T10 of the body to
the stand above the front arch (push the
front edge of the body to the portal as
much as possible). Before you connect
the two parts, apply adequate
a hole for the thermometer. Main-
tain a dilatational interstice at least 3
mm between the upper edge of the front
arch and the front part of the body. For this
purpose place the supplied dilatation pads under the
side edges. If you use more than 2 pieces of pads on top of
each other, bind them together using silicone caulk. (A purpose of the silicone
caulk application between the two front parts is to connect them so that they
don't spread and also as a protection against water if you don't follow the
warranty conditions to place the oven under a roof.)
Apply silicone caulk between the body parts and along
oven circumference between the bottom edge of the
body and the stand - into the formed joint, the used
dilatation pads should also get fixed. Silicone the
chinks in the way the silicone caulk  could be
removed in the case of necessity of disas-
sembling the oven (e.g. in the case of a
warranty claim).
A purpose of this silicone caulk application is
to prevent water to get into the oven in the case
you don't follow the warranty conditions to place
the oven under a roof. If you follow the conditions, it's
enough to fix the dilatation pads.
12)
Place the small side arch between the front
towards the front portal.
17)
amount of silicone caulk into the
locks and on the whole
surface between the parts.
Make sure the caulk don't fill
Place the rear body to the
stand above the rear arch.
20)
13)
Place the central part of the arch with a hole
towards the chimney. Shape should be placed
on the top of the arch.
18)
possible. If it is necessary to align the parts, place the supplied dilatation
pads under the side edges, preferably at places marked by arrows (9
points). Do not remove the pads. If you use more than 2 pieces of pads on
top of each other, bind them together using silicone caulk.
Cut out a hole for the chimney (through insulation and the aluminium foil). Place the rope seal
into the opening in the front body into the prepared groove in the inner front arch to create
two threads of rope seal. Insert carefully the chimney base until the cover flange sits
properly on the oven body. You can check with your hand from inside of the chimney if
the rope doesn't get distorted while inserting the chimney base (if the rope gets
damaged, heat and smoke can get into the space between the inner shapes
and the body). Turn the dumper always lightly, not more than 90 degrees.
Otherwise the thread may turn and the sign "open, closed" may not corre-
spond with an actual position. Preferably don't pull out the chimney base
out of the oven very often otherwise the rope seal may get damaged. When
attaching chimney which is longer than half a meter, make sure that chimney
system is not exerting excessive pressure on the body. Close the oven with steel door.
Last, place the thermometer into the opening behind the chimney (for proper mounting it
14)
Place the last two shaped pieces
into the remaining space so that the locks match.
Place the central
part of the body on the
stand between individual
parts of the body so that the
cutouts of individual shaped pieces
match and joints are as narrow as
is necessary to pierce through the insulation).