Follett HCF1400RJS Manuel d'instructions d'installation - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Follett HCF1400RJS. Follett HCF1400RJS 17 pages. For drop-ins
Prepare the dispenser.
2.1
3.1
Dispenser preparation
➌
➍
4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
➋
• Install gasket
onto bulkhead fi tting
• Attach bulkhead fi tting with fl at up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
➑
cap
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
➋
➊
➌
➍
and tighten bulkhead nut
➏
with supplied screws
remote condensing
Dispenser preparation
Hot Water
160 F (71 C)
➐
➎
➏
➓
➐
➑
➊
➎
➐
into bulkhead fi tting and secure with coupling
➓
DROP-IN • RIDE Technology
➒
12"
(304,8mm)
min.
➐
➒
3