Follett Horizon Elite Chewblet 1410 Series Manuel d'instructions d'installation - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Follett Horizon Elite Chewblet 1410 Series. Follett Horizon Elite Chewblet 1410 Series 16 pages. For drop-ins
Également pour Follett Horizon Elite Chewblet 1410 Series : Manuel (8 pages), Manuel d'instructions d'installation (17 pages), Manuel (8 pages)

Follett Horizon Elite Chewblet 1410 Series Manuel d'instructions d'installation
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of
ice machine in accordance with local and national codes. Outdoor installation
of low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1–5 amps
Potable water supply
• 10–70 psi (69–483 kpa)
• 45–90 F (7–32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drain
(3/4" Barb)
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4 mm/0,3 m).
Refrigeration lines
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
BIN • RIDE Technology
(3/8" push-in internal connection, 3/8" OD tubing required)
remote condensing
5/8" ∅ (22,4mm)
3/8" ∅ (9,5mm)
1/4" per foot
(6,4 mm per 0,3 m)

Site preparation

2 ft. x 1" OD
silicone tubing
and ttings
provided
NEMA
5-15
2
5