Follett Horizon Elite Chewblet HCD1410RBT Manuel d'instructions d'installation - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Follett Horizon Elite Chewblet HCD1410RBT. Follett Horizon Elite Chewblet HCD1410RBT 13 pages. For ice storage bin top-mount applications
Également pour Follett Horizon Elite Chewblet HCD1410RBT : Manuel (8 pages), Manuel (8 pages)

Follett Horizon Elite Chewblet HCD1410RBT Manuel d'instructions d'installation

Prepare the installation site.

Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1-5 amps
Potable water supply
• 10–70 psi (69–483 kpa)
• 45–90 F (7–32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable federal,
state, and local codes
Drain
(3/4" Barb)
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least 1/4" per foot
pitch (6,4 mm/0,3 m).
Refrigeration lines
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
BIN • TOP-MOUNT
(3/8" push-in internal connection, 3/8" OD tubing required)
remote condensing
3/8" ∅ (9,5mm)
5/8" ∅ (15,8 mm)
1'
1/4" per foot
(6,4 mm per 0,3 m)

Site preparation

Minimum 8"
radius
2 ft. x 1" OD
silicone tubing
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" Stand pipe/Drain
NEMA
5-15
2
5