Follett Horizon Elite Chewblet HCF1010RMS Manuel d'instructions d'installation - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Follett Horizon Elite Chewblet HCF1010RMS. Follett Horizon Elite Chewblet HCF1010RMS 16 pages. Ice machine with ride technology installation instructions for ice manager diverter valve
Également pour Follett Horizon Elite Chewblet HCF1010RMS : Manuel d'instructions d'installation (17 pages)

Follett Horizon Elite Chewblet HCF1010RMS Manuel d'instructions d'installation
Install the ice transport tube.
4.2
Ice transport tube installation.
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
For long tube runs see guide on page 15.
• Pitch ice transport tube at least 1/4" per foot (6,4mm/.3m)
• Ice transport tube must drain towards ice machine
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
Hot Water
160 F (71 C)
1/4"
1'
as needed to prevent dips and traps from forming.
remote condensing

Ice transport tube

ICE MANAGER
4