Follett Horizon Elite HCC710AJS Manuel d'instructions d'installation - Page 15

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Follett Horizon Elite HCC710AJS. Follett Horizon Elite HCC710AJS 17 pages. For drop-in
Également pour Follett Horizon Elite HCC710AJS : Manuel d'instructions d'installation (17 pages)

Follett Horizon Elite HCC710AJS Manuel d'instructions d'installation
Install front cover to ice machine.
Front cover installation –
air-cooled undercounter only
CAUTION
• Keep ventilation openings in the appliance
enclosure clear of obstruction.
• To ensure proper ventilation (if not using
supplied grille) carefully review air circulation
specifications in section 4.1
• Remove and discard plastic grille
• Apply supplied gasket material around
entire opening on skin to prevent air
recirculation
• Attach supplied metal grille to opening in
counter door (see section 4.1)
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.
DROP-IN • RIDE Technology
NOTICE
Ice machine MUST be sanitized prior to operation!
self-contained
Install front cover
• Slide ice machine cover over machine
ensuring that tabs on back of cover
slip under louvers on back of docking
assembly
• Insert and tighten two screws through
cover and into docking assembly
• For air-cooled machines only, install
plastic grill
8

Front cover

15