Dr. Dunk SPTBBLDRDBS16 Manuel de l'utilisateur - Page 13
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Dr. Dunk SPTBBLDRDBS16. Dr. Dunk SPTBBLDRDBS16 19 pages.
Heavy-Duty Basketball Stand - SBA305 - A Series
Secure the top of the outer lifter pole (EE) to the
backboard brace (longer) (T) with bolts A1 –
A4. The bushing A2 must be between the
backboard (longer) (T) and the outer lifter pole
(EE).
Secure the inner lifter pole (FF) to the triangular
block (Q) with bolts L1 – L3.
Do not tighten nut all the way. It will need to
be removed when adding tensioning springs
in the next step.
E&OE
Install the link block (Z) at the top end of the top pole (W)
with bolts K1 – K4. The bushing (K2) must be put at the
side of the top pole with bolt K1 to prevent the top pole
from bending out of shape. Do not secure the bolt K1 too
tightly before securing the pole brace (S, T) first.
Connect the backboard brace (S, T) on the link block of
the top pole (Z) with bolts B1 – B4 and D1 – D3. The
bushing (B2) must pe put inside the link block (Z) with bolt
B1 to prevent the link block (Z) to bend out of shape.
Finally, install the cap on the top pole (W).
© 2020 Dr. Dunk
Refer reference
image
A1
on page 17
Refer reference image
A2
on page 17
13