AirStage ABYA036GTEH Manuel d'installation - Page 15

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} AirStage ABYA036GTEH. AirStage ABYA036GTEH 16 pages.

• Setting details
Function number
Item
01
Indoor unit address
02
Refrigeration address
For use with a remote controller, set all rotary switches to 0, and refer to "7.1. Setting the
address" for details.
All switches are set to 0 at the factory.
(2) Others
Indication pattern
Indicator Name
OPERATION indicator lamp (Green)
TIMER indicator lamp (Orange)
FILTER indicator lamp (Red)
(Example) Function : 31, Setting number : 2
OPERATION
ON
indicator
0.5s
0.5s
0.5s
0.5s 0.5s 0.5s
lamp (Green)
OFF
ON
TIMER
indicator
0.5s 0.5s
lamp (Orange)
OFF
ON
FILTER
0.5s
0.5s
0.5s
0.5s
indicator
OFF
lamp (Red)

8. FRESH-AIR INTAKE

(1) Open up the knockout hole for the fresh-air intake (If using half-concealed installation,
open up the top knockout hole instead.)
For half concealed installation
When removing the cabinet (iron plate), be careful not to damage the indoor unit
internal parts and surrounding area (outer case).
When processing the cabinet (iron plate), be careful not to injure yourself with burrs,
etc.
(2) Fasten the round fl ange (optional) to the fresh-air intake (If using half-concealed instal-
lation, attach to the top.)
Round duct (Option parts)
Setting number
00 to 63
00 to 99
Indication pattern
Function number; tens place
(0.5s ON/0.5s OFF)
Function number; ones place
(0.5s ON/0.5s OFF)
Setting number: (0 to 9) (0.5s ON/0.5s OFF)
1 cycle 12 sec
9 sec
11 sec
10 sec
Indoor unit
CAUTION
[After completing "3.3. Installing the unit"...]
(3) Connect the duct to the round fl ange.
(4) Seal with a band and vinyl tape, etc. so that air does not leak from the connection.
Duct

9. FINISHING

(1) Reattach cover A and B. Then fasten the control box back into its original position us-
ing the 4 tapping screws.
Cover A
(2) Attach the remote controller cable, transmission cable, power supply cable and cable
clips. Make sure that they are positioned so that they will not interfere with opening and
closing of the intake grille or with removal and installation of the air fi lters.
Cable clip
(3) Close the piping outlet with the closing material (putty etc.).
(4) Install the fi lter guide.
(5) Install the intake grilles.
(6) Install side covers A and B (if the unit is installed in a half-concealed orientation, only
install side cover A).
(7) Install the air fi lters.

10. TEST RUN

10.1. Test run using Outdoor unit (PCB)

• Refer to the Installation Manual for the outdoor unit if the PCB for the outdoor unit is to
be used for the test run.

10.2. Test run using remote controller

• Refer to the Installation Manual for the remote controller to perform the test run using
the remote controller.
• When the air conditioner is being test run, the OPERATION and TIMER indicator lamps
fl ash slowly at the same time.
Top of the Cover B
Top of the Cover A
Cover B
Remote controller cable
Transmission cable
Power supply cable
En-14