Draper SLX14 Instructions d'installation et d'utilisation - Page 6

Parcourez en ligne ou téléchargez le pdf Instructions d'installation et d'utilisation pour {nom_de_la_catégorie} Draper SLX14. Draper SLX14 8 pages. 230v ac scissor lift slx video projector lift
Également pour Draper SLX14 : Brochure & Specs (16 pages), Manuel d'installation et d'utilisation (7 pages), Manuel d'installation et d'utilisation (7 pages), Instructions d'installation et d'utilisation (4 pages), Manuel d'installation et d'utilisation (7 pages)

Draper SLX14 Instructions d'installation et d'utilisation
Scissor Lift - SLX 115V

Section 8 - Connecting Controls to Data Cable Splitter Board

1. Controls plug into the Data Cable Splitter Board
on the Top Frame on the front side of the lift, using RJ45 connectors.
2. IR or RF Control options available.
3. For serial control, use data cable connectors on splitter board.
MAKING YOUR OWN CABLES?
PIN OUTS
1 - UP
2 - DOWN
3 - NOT USED
4 - NOT USED
5 - NOT USED
6 - NOT USED
7 - COM
8 - COM
Section 9 - Changing the Show Position
NOTE: BOTH Wall Switch & Key Switch REQUIRED for this procedure.
PLEASE NOTE: Lift MUST be put into PROGRAMMING MODE.
Section 9.1 - Entering Programming Mode
1. Move lift to the CLOSED
(fully up)
2. While lift is at the CLOSED position,
Press and hold Wall Switch UP + Key Switch UP for 15 Seconds
and release once the lift begins to move.
3. The show position is now cleared and ready for a new show position to
be set.
PLEASE NOTE: At this point the Key Switch will not operate until the new
"Show Position" has been set. Also the 3-Button Wall Switch changes
into a maintain, push and hold type button, for continuous movement.
This allows for easy setting of new "Show Position")
9.2 - Procedure for setting show position:
1. Now that the show position has been cleared, use wall switch up and
down buttons to get lift into desired show position.
2. While lift is at desired show position, Press and hold Key Switch UP
until lift begins to move upward. Lift will begin a calibration cycle where
it will move upward for two seconds, stop then move down for one
second and then the Lift will return to the desired show position.
Section 9.3 - Exiting Programming Mode
1. Move lift to the CLOSED
(fully up)
2. While lift is at the CLOSED position,
Press and hold Wall Switch UP + Key Switch DN for 15 Seconds
and release once the lift begins to move.
3. The show position is now set.
which is located
(See diagram below)
LED Feedback:
Flicker GREEN
WORKING
Flicker ORANGE
ERROR
SP-KSM
Key Switch Service Position
Red - Down
Pin 2
Black - Com
Pin 7 or 8
Black - Com
Blue - Up
Pin 1
position.
position.
Please Note:
Any control, including automated dry contact systems,
being connected to the wall switch input MUST send a
momentary signal.
DATA CABLE SPLITTER BOARD
KEY
WALL
Serial Ports
SWITCH
SWITCH
PORT
PORT
PINS
PINS
1
1
2
2
A-
3
3
4
4
B+
5
5
6
6
7
7
GND
8
8
LVC-S
Show Position

Section 10 - Optional Delay Feature

1. When the Optional Delay Feature is installed the Delay Switch must be in
the "Delay On" position for normal operation.
2. If the Optional Delay Feature is installed and the "Show Position"
requires adjusting, then the "Delay Switch" must be switched to OFF
while adjusting the show position.
CAUTION: Be sure all switches are in OFF position before adjusting
limit switch. Always be prepared to shut lift off manually when new
adjustment is being tested. Please refer to wiring diagram.
PLEASE NOTE: If the Scissor Lift loses power, the DOWN function will not
work until you operate the lift in the UP direction using the wall switch.
This allows the lift's control encoder to recognize it's "home" location.
KEE P DEL AY IN
OFF POS ITIO N
CUR REN T SEN SOR
page 6 of 8
3-28 VDC
LOW
IR
VOLTAGE
Polarity Independent
TRIGGER
GDN
DIN
DOUT
BACK
of
LVC-S
DCU
Pin 2
Pin 7 or 8
Pin 1
WH EN
IS NO T USE D