1Move Street Workout Full Manuel - Page 5
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} 1Move Street Workout Full. 1Move Street Workout Full 7 pages.
11
12
SEMI-DRY
CONCRETE
C20/25
13
14
PUT VERTICAL POLES
AS INDICATED
ON PICTURE No. 11
PUT ON ONE HORIZONTAL
LADDER ON THE POLES AND
FIX THE CLAMPS ON THE
SCREWS USING THE TOOLS,
BUT DO NOT TIGHTEN.
AGAIN, USE SEMI-DRY
CONCRETE CLASS MIN. C20/25
TO FILL THE HOLES AND
CREATE FOOTINGIN
DIMENSION 50x50x50 CM.
TOP OF THE CONCRETE
FOOTING SHAPE INTO A CONE.
LET IT DRY FOR NEXT 24H.
ON THE NEXT DAY TIGHTEN
THE SCREWS TO THE
MAXIMUM.
5