Anchor NAVI-TRAC NAV40GBL-1104 Manuel de l'utilisateur - Page 10

Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Anchor NAVI-TRAC NAV40GBL-1104. Anchor NAVI-TRAC NAV40GBL-1104 16 pages. Frame tent system, 40’ wide gabled end system

ERECTING 2nd BEAM 1st
ATTACH PUSH POLE EXTENSION TO
TOP OF THE LONG LIFTING POLE.
HOOK INTO PEAK WELDMENT BRACKET
& TWIST TO SECURE. THIS WORKER
CONTROLS PEAK DURING ERECTION.
SECURING THE 1st BEAM SAFELY
ON THE LEADING 2-PC SAFETY WEBS, WORKERS
INSERT LOOSE ENDS OF UPPER SAFETY WEBS INTO
THE RATCHETS OF THE LOWER SAFETY WEBS.
ERECTING THE 2nd BEAM
10
AS THE 2ND BEAM PIVOTS
TOWARD VERTICAL, THE
TRAILING SAFETY WEBS
DRAW TIGHTER.
USING RATCHETS, ADJUST LEADING AND
TRAILING SAFETY WEBS AGAINST EACH
OTHER ON BOTH SIDES OF THE STRUCTURE
TO SECURE AND VERTICALLY ALIGN THE
BEAM
WITH 2nd BEAM SECURED BY SAFETY WEBS, THE
1st BEAM IS ROTATED TOWARD IT. (2) OR (3)
WORKERS SHOULD HOLD THE BEAM AT VERTICAL
UNTIL EAVE BARS (ER20) ARE INSTALLED (SEE
NEXT STEP).
WORKERS LIFT FIRST AT THE
PEAK, THEN SHUFFLE SIDEWAYS
TOWARD THE UPRIGHTS.