Dream Line AQUA LUX Manuel d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Dream Line AQUA LUX. Dream Line AQUA LUX 7 pages. Shower / tub door

Preparation
1. After opening the boxes, read this introduction carefully, check all the packed parts are
complete by cross checking all the components against the "Detailed Diagram of Shower
Door Components". Examine for shipping damage. If the unit has been damaged or has a
finishing defect, please contact your local distributor within 3 business days. Please note
that Bath Authority
free of charge after 3 business days or if the product has been installed. Contact your
distributor or DreamLine if you have any questions.
2. Please note that you should consult your local building codes on questions on
installation compliance standards. Building and plumbing codes vary by location,
and DreamLine is not responsible for code compliance standards for your project.
3. Please ensure that prior to the installation the floor is leveled and solid. Also make sure the
walls are at right angles. While some adjustment in leveling of the door is possible, irregular
floor level or improper angle of side walls will result in serious problems for your installation.
Please note that there are some adjustments and drilling might be necessary during the
installation process.

Tools Required

Rev.1.2 
TM
TM
/ DreamLine
will not replace any damaged product or parts
Page 2