Carmanah R829-E Manuel de démarrage rapide - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel de démarrage rapide pour {nom_de_la_catégorie} Carmanah R829-E. Carmanah R829-E 20 pages. Traffic beacon
Également pour Carmanah R829-E : Manuel de remplacement du système de gestion de l'énergie (12 pages), Manuel d'installation (20 pages)

Carmanah R829-E Manuel de démarrage rapide
Integrated Solar Engine with Signal Head – Round / Square Post
4.4
1. Install supplied longer set screws into mount, if required (4.0" OD posts only; see mount contents above).
2. Align serrated lock ring so that tabs fit into slots in bottom of solar engine.
3. Obtain signal housing with reinforcement bracket(s). Install solar engine through top signal housing hole
and into hex nut.
4. Install nipple through load spreader plate (12" signal housings only), bottom signal housing hole, serrated
lock ring, and tighten onto mount after aligning lock ring tabs with mount slots.
5. Tighten screw/bolt at top of mount.
6. Install on post, adjust the rotation of the signal head if required and adjust the rotation of the solar engine
to face South (for Northern Hemisphere locations).
7. Tighten mount screws onto post, then tighten hex nut.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
E/F SERIES QUICK START GUIDE
|
carmanah.com
8