10. Burner Installation
Check below items before burner installation:
–
The gas nozzles on the burner rows are not plugged.
–
Remove dust and other particles
–
Check on obstructions in burner duct
–
Gaskets between burner and duct flanges
–
Check alignment of system.
–
Install UV-scanners on burner
11. Buner starting
Special attention:
The ANM77 Series burners, described herein, are designed to mix fuel with air. All fuel
burning devices are capable of producing fires and explosions, if improperly applied,
installed, adjusted, controlled, or maintained. Do not bypass any safety feature; fire or
explosion could result. Never try to light a burner if it shows signs of damage or
malfunction.
11.1
Pre-commissioning Requirements
Gas supply pipework up to the isolating ball valve should be pressure tested and purged.
Gas to be available at a pressure between 80% and 100% of supply pressure at system inlet.
Compressed air into pneumatic safety shut off valves should be provided at a pressure of
4.0 bar in case pneumatic devices are applied.
Electrical supply to the Burner Management System should be supplied at specified voltage
and frequency.
All field wiring from the burner management system control panel to the equipment should
be installed and tested according the wiring diagrams.
All three-phase power cables to electrical motors should be installed. Combustion air fan,
auxiliary air fan should be checked for correct rotation direction. Thermal overload devices
should be preliminary set.
Process air temperature should follow this manual technical description. The mentioned
process flow should be available for burner commissioning. Make sure no impurities flow
into the combustion air chamber.
11.2
Commissioning Procedure
1. Visual inspection of the burner equipment, paying particular attention to the support
structure of the gas pipe work. Inspect internal duct, looking for mechanical damage to
the burner.
2. Set and adjust the position of the auxiliary profile plate of process air across burner,
measure the pressure in the air duct with a pressure gauge, and ensure that the DP
before and after the profile plate reaches the required value, thereby determining the