Daikin VRV-WIII RWEYQ18PY1 Manuel d'utilisation - Page 18
Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation pour {nom_de_la_catégorie} Daikin VRV-WIII RWEYQ18PY1. Daikin VRV-WIII RWEYQ18PY1 20 pages. Vrv-wiii system air conditioner
• Malfunction:
Inform the staff of the defective details.
(Malfunction code being displayed on
the remote controller.)
• Name, address, telephone number
• Repair after the warranty term is expired
Contact your dealer. If necessary to repair, pay
service is available.
• Minimum storage period of important parts
Even after a certain type of air conditioner is dis-
continued, we have the related important parts in
stock for 9 years at least.
The important parts indicate parts essential to
operate the air conditioner.
• Recommendations for maintenance and
inspection
Since dust collects after using the unit for several
years, the performance will be deteriorated to
some extent.
Disassembling and cleaning inside require techni-
cal expertise, so we recommend entering a main-
tenance and inspection contract (at a cost)
separate from normal maintenance.
• Recommended inspection and maintenance
cycles
[Note: The maintenance cycle is not the same
as the warranty period.]
Table 1 assumes the following usage conditions.
1. Normal use without frequent starting and stop-
ping of the machine.
(Although it varies with the model, we recom-
mend not starting and stopping the machine
more than 6 times/hour for normal use.)
2. Operation of the product is assumed to be
10 hours/day, 2500 hours/year.
• Table 1 "Inspection Cycle" and "Maintenance
Cycle" Lists
Inspection
Name of Main Part
Cycle
Electric motor (fan,
damper, etc.)
PC boards
Heat exchanger
Sensor (thermistor, etc.)
1 year
Remote controller and
switches
Drain pan
Expansion valve
Electromagnetic valve
Note 1
This table indicates main parts.
See the maintenance and inspection contract for
details.
14
Note 2
This maintenance cycle indicates recommended
lengths of time until the need arises for maintenance
work, in order to ensure the product is operational
as long as possible.
Use for appropriate maintenance design (budgeting
maintenance and inspection fees, etc.).
Depending on the content of the maintenance and
inspection contract, the inspection and maintenance
cycles may in reality be shorter than those listed
here.
Shortening of "maintenance cycle" and
"replacement cycle" needs to be considered in
the following cases.
1.When used in hot, humid locations or locations
2. When used in locations where power fluctuation
3. When installed and used in locations where
4. When used in bad locations where dust, salt,
5. When used in locations where the machine is
■ Recommended replacement cycle of wear-out
[The cycle is not the same as the warranty period.]
• Table 2 "Replacement Cycle" Lists
Name of Main Part
Air filter
High efficiency filter
(Optional accessory)
Maintenance Cycle
Fuse
[replacements and/or
Crankcase heater
repairs]
Note 1
20,000 hours
This table indicates main parts.
25,000 hours
See the maintenance and inspection contract for
5 years
details.
5 years
Note 2
25,000 hours
This maintenance cycle indicates recommended
lengths of time until the need arises for maintenance
8 years
work, in order to ensure the product is operational
20,000 hours
as long as possible.
20,000 hours
Use for appropriate maintenance design (budgeting
maintenance and inspection fees, etc.).
where temperature and humidity fluctuate greatly.
(voltage, frequency, wave distortion, etc.) is high.
(Cannot be used if it is outside the allowable
range.)
bumps and vibrations are frequent.
harmful gas or oil mist such as sulfurous acid and
hydrogen sulfide may be present in the air.
started and stopped frequently or operation time
is long. (Example: 24 hour air-conditioning)
parts
Inspection
Cycle
1 year
Replacement Cycle
5 years
1 year
10 years
8 years
English