Atlantic SP1600 Manuel du produit - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel du produit pour {nom_de_la_catégorie} Atlantic SP1600. Atlantic SP1600 12 pages. Oasis series skimmer, filterfalls, pump vault, fastfalls
Également pour Atlantic SP1600 : Manuel d'instruction (16 pages)

Gravel-Filled Reservoirs

Because Eco-Blox are 96% void space, they allow the reservoir to be dug to just the size
required for the water volume needed. Backfilling with gravel fills 65% of the reservoir
with stone, leaving only the 35% that remains between the stones available for water
storage. This means that a gravel-filled basin will need to be three times larger than an
Eco-Blox basin to hold the same volume of water. That's a lot more time, excavation,
additional soil removed, additional gravel to fill the hole, labor costs and cleanup.
For Larger Basin Volumes
For installations where a larger basin volume or a deeper basin is required, Atlantic offers
Pump Vault Extensions for both the PV1800 and PV2300. Each additional layer of Eco-Blox
increases the depth of your excavation by 17.5"; use one Extension for each additional layer.
Transitional Volume x 3 = Minimum Reservoir Volume
(when filled with Eco-Blox)
Transitional Volume x 9 = Minimum Reservoir Volume
(when filled with gravel)
3