DROPSA 201000 Manuel d'utilisation et d'entretien - Page 4
Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation et d'entretien pour {nom_de_la_catégorie} DROPSA 201000. DROPSA 201000 10 pages. Pneumatically operated pump
N.B. Action to be taken prior to start up
•
Verify the integrity of the pump;
•
Insert the pump ensuring there are no air bubbles in the grease.
•
Ensure the pump is at working temperature and the tubing is free of air bubbles;
•
Check the integrity of the supply line.
•
Ensure that any electrical connections have been effected correctly (CEI 64/8, IEC 364);
•
Check the connections of any level and solenoid valve to the control panel;
7.2 USE
1.
verify the settings made on the control panel (where fitted);
2.
press the start button of the machine to which the pump is connected;
3.
verify the starting of the pump;
4.
verify the adequate lubrication of the machine (if doubt exists as to the correct functioning
consult the Engineering Department of Dropsa SpA to request test procedures).
7.2.1 METHODS OF COMMANDING THE PUMP
It is possible to command the pump manually, by means of a simple valve, or
automatically by means of a 3-way solenoid valve.
4