Ankom A2000I Procédure de service

Parcourez en ligne ou téléchargez le pdf Procédure de service pour {nom_de_la_catégorie} Ankom A2000I. Ankom A2000I 3 pages. Motor assembly replacement
Également pour Ankom A2000I : Procédure de service (2 pages), Procédure de service (3 pages), Manuel de remplacement (2 pages)

Ankom A2000I Procédure de service
1. Place cardboard on a table. Lay the A2000 on
it's front. Remove the nuts that secure the clear
back panel. Remove the panel. Remove the
feet and mounting screws, then remove the
bottom panel.
3. Loosen the packing nut until it is finger loose.
5. Unplug the motor wires and set the motor out of
the way.
ANKOM Technology 2052 O'Neil Road Macedon, NY 14502 PH: (315) 986-8090 FAX: (315) 986-8091
Packing and Agitator Replacement
A2000/A2000I
2. Loosen the top set screw on the coupler.
4. Remove the three nuts that secure the motor
bracket in place
6. Twist and pull up to remove the agitator.
002
Service Procedure #
(Page 1 of 3) 08/05/2014