Ankom A01 Installation - Page 2
Parcourez en ligne ou téléchargez le pdf Installation pour {nom_de_la_catégorie} Ankom A01. Ankom A01 2 pages. Cubetainer shelf
5. With the inside facing up, attach the Support Post
into the center of the Shelf Platform (red arrows).
6. Remove six nuts from the back of the A2000 (red
arrows).
Slide on the Left and Right Support Brackets and
7.
the Triangular Back Brace as shown (red arrows),
then replace the nuts. Adjust the Leveling Foot
(blue arrow) as needed to support the bracket. The
foam strip should rest on the top of the A2000.
Final view of A2000 with Cubetainer shelf installation
A01 Cubetainer Shelf Installation
A2000/A2000I
2052 O'Neil Rd Macedon, NY 14502 PH: (315) 986-8090 FAX: (315) 986-809
AS024
Service Procedure
Rev. B Date: 09/13/2017
6/25/19
C