DAIREN SQW 12-4ND Manuel d'utilisation - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation pour {nom_de_la_catégorie} DAIREN SQW 12-4ND. DAIREN SQW 12-4ND 10 pages.
4) Timer Setting
Upon clicking the button
the voltage and current for
5) Definitions of MCB
The Input MCB is installed on the left side of the door panel and will input
230VAC to the UPS.
The Output MCB is installed on the right side of the door panel and will output
230VAC to the load.
Revision: 01
Operation Manual of 12V UPS
Timer
Switch, the LED panel will display
4
hours.
Date: Dec.5. 2021
Page
of
6
10