Bourgault XR770 Manuel de démarrage rapide - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel de démarrage rapide pour {nom_de_la_catégorie} Bourgault XR770. Bourgault XR770 11 pages. Pre delivery inspection checklist

Tine angle indicator has been properly adjusted so the pointer remains
over the decal throughout the full range of motion. Linkage bolts are not
fully tightened so the linkages do not bind.
Tine holder 8621-59 is installed on the front inside corner of the both
RHS and LHS outermost sections to prevent the tine from interfering
with the boom wheel pivot in transport position.
All parallel arm pins are installed with the heads towards the center of
each section, and the retention bolts are installed.
Slow moving sign installed.
All paint damage has been repaired
IMPORTANT:
2900 psi or higher for sequencing to occur properly. IF harrows do not
fully raise make sure tractor has at least 2900 psi before adjusting the
sequence valve.
Paint touch ups complete
No hydraulic leaks
Transport circuit with sequence valve is functioning properly. During
fold-up, transport cylinders fully retract before boom wheels turn.
During unfold, boom wheels turn completely before transport cylinders
extend. (Sequence valve may need to be adjusted for different tractors)
Tine angle circuit is functioning properly. Cylinders on all sections
extend and retract evenly.
Operators manual is with machine.
Cable wing stop assembly is installed so that the cable is tight
diagonally across the sections and all the slack is between sections
behind the knuckle.
Ensure safety lights function correctly -
locking arms lock when unfolding the unit
Preform fold/unfold. (see Sequence valve adjustment on following
pages or Operators manual if adjustment is needed)
Harrows
Initial hydraulic pressure of the tractor will need to be

Final Inspection

Left & Right signals work correctly
CHECKED BY:
Check off
Check off