Bourgault X35 Manuel de référence rapide - Page 4

Parcourez en ligne ou téléchargez le pdf Manuel de référence rapide pour {nom_de_la_catégorie} Bourgault X35. Bourgault X35 6 pages. N-cab components installation for 6000/ 7000 series air seeders
Également pour Bourgault X35 : Manuel d'instructions de service (10 pages)

4. Seeding
If the Master Switch icon is
white it means the system is
ready to seed.
If the Master Switch icon is red
it means something is not ready
preventing you from starting to
seed. Press the icon to bring up a
Status menu displaying what is preventing
seeding.
When the Master Switch is
turned on and the unit is seeding
the icon will be green.
When the Master Switch is
turned on but something is stop-
ping the meters from turning the
icon will be yellow. (e.g. ASC
over coverage, tanks switched off, etc.)
Start moving and turn Tank switches and Master switch ON to begin seeding (using
cabin switchbox or on screen switches).
APPLIED RATE
WEIGHT
REMAINING
TANK SWITCH
ICON
FAN SPEED
APPLIED
RATE
Note: All the screens might not look exactly the same as shown depending on how the
monitor is setup and what airseeder configuration is being used.
X35 Console
(v 4.02)
NOT READY
Quick Reference Guide
MASTER
SWITCH
ICON