3onedata IES5328 Series Manuel d'installation rapide
Parcourez en ligne ou téléchargez le pdf Manuel d'installation rapide pour {nom_de_la_catégorie} 3onedata IES5328 Series. 3onedata IES5328 Series 3 pages. Layer 2 managed industrial ethernet switch
IES5328 Series
Layer 2 Managed Industrial
Ethernet Switch
Quick Installation Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial Park, Song Bai Road, Nanshan
District, Shenzhen, 518108, China
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check the integrity of package and accessories while
first using the switch.
1. Industrial Ethernet switch
2. Power line x2 (AC products only)
3. Serial port line
4. Rack-mounting lug x2
5. Foot pad x4
7. Warranty card
8. Certification
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
This series are managed layer 2 industrial Ethernet switches.
The models are:
Model I. IES5328-16GT4GS8GC-2P220 (16 Gigabit
Copper Ports + 4 Gigabit SFP + 8 Gigabit Combo
+ 2 220VAC Power Supplies)
Model II. IES5328-16GT4GS8GC-2P48 (16 Gigabit Copper
Ports + 4 Gigabit SFP + 8 Gigabit Combo + 2
48VDC Power Supplies)
Model III. IES5328-16GT4GS8GC-2P24 (16 Gigabit Copper
Ports + 4 Gigabit SFP + 8 Gigabit Combo + 2
24VDC Power Supplies)
【Panel Design】
Front panel
Model I, Model II, Model III
Rear panel
Model I
Model II, Model III
1.
Gigabit Combo port (G1-G8)
2.
Gigabit Ethernet copper port (G9-G24)
3.
Gigabit SFP interface (G25-G28)
4.
Ethernet port indicator (G1-G28)
5.
Console port
6.
Device running state indicator (RUN)
7.
Restore default settings(RESET)
8.
Alarm indicator (ALM)
9.
Power indicator (P1/P2)
10. Lugs
11. Terminal blocks 2 for relay output
12. AC power supply input (PWR2)
13. Grounding screw
14. AC power supply input (PWR1)
15. Terminal blocks 1 for relay output
16. DC power supply input (PWR2)
17. DC power supply input (PWR1)
【Mounting Dimension】
Unit: mm
Notice Before Mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power