AirTrack Factory AirBeam Manuel de l'utilisateur - Page 9
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} AirTrack Factory AirBeam. AirTrack Factory AirBeam 12 pages.
Également pour AirTrack Factory AirBeam : Manuel de l'utilisateur (7 pages)
SET-UP
1
Foot pump
Make sure the adapter is placed on the hose properly (4) and the blower or footpump is set to infl ate (1,3).
5
Open the grey valve by twisting it to the left (6). Make sure the pin inside the valve is pressed out (8).
9
Attach the blower by twisting the adapter to the right (10) and turn on the blower. Your equipment should
start infl ating. When fully infl ated remove the hose. The equipment should not release air. (13)
13
Check the pressure with the manometer (optional) or jump on the equipment to test if the pressure is up
to your standards. If so, close the grey valve (15). Check the pressure before each training.
PACK UP
17
Defl ate the equipment by simply pressing the pin inside the grey valve. The equipment should defl ate.
21
Roll up the equipment and store it. To completely defl ate the equipment, the blower and foot pump can
be set to defl ate. This way the equipment will become completely fl at.
When rolling up the AirBeam, make sure that the center line is facing down!
www.airtrackfactory.com - [email protected] - Tel. +31 (0)24 89 09 659
2
6
10
14
18
22
3
OV10 blower
7
11
15
19
23
4
8
12
16
20
9