3onedata IES308 Manuel d'installation du matériel - Page 7

Parcourez en ligne ou téléchargez le pdf Manuel d'installation du matériel pour {nom_de_la_catégorie} 3onedata IES308. 3onedata IES308 10 pages.

3onedata IES308 Manuel d'installation du matériel
5. Power need: Redundant, dual 24VDC(12VDC~36VDC)
6. Environment: -40 to 75°C
Storage Temperature: -45°C to 85°C
Relative humidity 10% to 95%
DIN-Rail Installation
In order to use in industrial environments expediently, IES308
series adopt 35mm DIN-Rail installation, the installation steps as
fellows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be suitability
or not .
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will insert into place as shown
below.
Wiring Requirements:
Be sure to disconnect the power cord before installing and/or wiring
your Ethernet Switch.
Calculate the maximum possible current in each power wire and
common wire. Observe all electrical codes dictating the maximum
current allowable for each wire size. If the current goes above the
maximum ratings, the wiring could overheat may causing serious
damage to your equipment. You should also pay attention to the
following items:
1. Use separate path to route wiring for power and devices. If
power wiring and device wiring paths must cross, make sure the
Your Serial and Data Communications Expert
Shenzhen 3onedata Technology Co.,Ltd