2C Displays Frame IT Manuel d'installation

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} 2C Displays Frame IT. 2C Displays Frame IT 2 pages. Cinema flocked frame screen

Step 6
There is a locking latch on the bottom wall mount only. (Fig 16)
Up Bracket
Bottom Bracket
Secure Button
(Fig 16)
Step 7
Fix the mounts onto the wall separately. (Fig 17-18)
(For 95" - height (h) = 1260mm & 105" - height (h) = 1430mm).
Up Bracket
Bottom Bracket
(Fig 17)
Step 8
Hook screen onto the top mount and bottom mount. (Fig 19-20)
(Fig 19)
Step 9
To uninstall the screen, please press the latch towards the
wall to release bottom frame from bottom mount, then lift the
screen a little to release it totally from top and bottom groove
of the mounts. (Fig 21-22)
(Fig 21)
(Fig 22)
Happy Viewing!
Protecting Your Screen:
• Keep away from direct sunlight or
high temperatures.
• Examine both the front and back surfaces
h
before retracting into the case to make sure it is
free of dust, dirt, insects or other foreign matter.
(Fig 18)
• Use a soft brush or cloth to lightly remove any
foreign particles.
Cleaning Your Screen:
• Do not use any solvents, chemicals or abrasive
cleaners on the screen surface.
• Use a mild detergent with warm water to
remove any marks on the surface or
screen case.
• Always immediately dab the screen with a soft
cloth to avoid soap marks.
(Fig 20)
• Do not scrub the surface.
Warranty: 12 Months
For more information please go to
www.2cdisplays.com.au
2C_FrameIT_Cinema_Flocked_Mar11_v1.1
or call 1300 730 025
2C Frame IT Cinema
Flocked Frame Screen
Installation Manual