4. Installation into the pipeline
For installation and operation of the hydrants consider the DVGW Leaflet W 331!
When installing the hydrant with the factory-provided flange gasket, the flange bolts should be tightening
with a max. torque of 70 Nm.
5. Description
5.1. Protection against pressurised water
Düker hydrants series 304/305 are equipped with the proven, automatic working protection against
pressurised water.
When opening the hydrant (main obturator), the pressurised water will flow into the hydrant only after the
draining outlet of the hydrant is safely closed.
When closing the hydrant, the drainage outlet will only be re-opened after the main obturator is safely
closed.
This construction avoids the flow of pressurised water through the drainage outlet, and residual water
remaining in the hydrant can be drained without problems into the surrounding soil. In order to ensure a
permanently safe and unhindered drainage, we recommend the use of drainage packages.
5.2. Technical characteristics
The underground fire hydrants Type 304 / 305 are designed to supply a minimum flow of 110 m³ per hour,
at an internal pressure loss of 1 bar.
The maximum allowable water flow velocity is 4 m/ s.
The residual rest water is lower than 80 cm
3
.
Connecting flange: DN 80 according to EN 1092-2
Soil covers: 0.80 m – 1.00 m – 1.25 m – 1.50 m
Factory test pressure: 24 bar
If the hydrant Type 305 (with double obturator) is used for supplying water in the pipeline, the maximum
flow velocity should not surpass 0.5 m/s (150 l/min.)
5.3. Flow values
01/042017