Dunkirk EXCELSIOR Series Instructions - Page 4
Parcourez en ligne ou téléchargez le pdf Instructions pour {nom_de_la_catégorie} Dunkirk EXCELSIOR Series. Dunkirk EXCELSIOR Series 4 pages. Oil fired boiler, knockdown assembly
15.
Attach the Rear Top panel with the screws provided.
Attach the hooks onto the front panel. See
16.
Figure 10
17.
Attach the front panel by setting onto the rivets in the
side jackets. See
Figure 11.
push where indicated until a click is heard.
Figure 11
KNOCKDOWN BOILER ASSEMBLY
Figure
10.
Swing the door up and
18.
Attach the top swing panel by snapping onto the
hinges on the top panel. See
19.
Proceed to "Packaged Boiler Assembly" in the Instal-
lation, Operation and Maintenance manual.
For technical assistance with this product call toll
free 1-800-325-5479
ECR International
Utica, NY 13504-4729
www.ecrinternational.com
4
Figure
12.
Figure 12
PO Box 4729