Duo-Therm 57915.331 Manuel d'instructions d'installation - Page 13

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Duo-Therm 57915.331. Duo-Therm 57915.331 17 pages. Roof top air conditioner/heat pump
Également pour Duo-Therm 57915.331 : Manuel d'installation et d'utilisation (17 pages)

Duo-Therm 57915.331 Manuel d'instructions d'installation
Installing unit with 3105007.XXX or 3105935.XXX Re-
turn Air Cover - Continued from page 10, column A.
5. Start each mounting bolt through the ceiling tem-
plate and up into the unit base pan by hand. Install
wood screw in each end of the ceiling template.
This insures a tight fit of the return air cover to ceil-
ing. Evenly tighten mounting bolts to compress
gasket to 1/2" this will be a torque of 40 - 50
inch pounds. See FIG. 12A.
CAUTION
If bolts are left loose there may not be ad-
equate roof seal or if over tightened, damage
may occur to the air conditioner/heat pump
base or ceiling template. Tighten to specifi-
cations listed in this manual.
FIG. 12A
To Front of RV
Screw
Finger
Tight
B. INSTALLATION OF DIVIDER PLATE
1. Measure the ceiling to roof thickness:
a. If distance is 2.0" - 3-3/4", remove perforated tab
from divider plate.
b. If distance is 3-3/4" - 5-1/2", remove no tabs.
2. Remove the backing paper from double sided tape
located on ceiling template. See FIG. 13A.
Peel Backing Paper Off
Foam Insulation On Divider
FIG. 13A
Plate
Installing unit with 3105007.XXX or 3105935.XXX
Return Air Cover - continued on page 14, column A.
ANALOG DUCTED INSTALLATION INSTRUCTIONS
Tighten to
compress
gasket to 1/2"
13
Installing unit with 3308120.XXX Genesis Air Filtration
System Return Air Kit Return Air Cover - continued from
page 12, column B.
2. Install relay box on ceiling template with blunt self-
tapping screws depending on the model see FIG.
12B for Brisk Air units and Fig.13B for Penguin units.
FIG. 12B
Brisk Air Models Mount
Control Box on Edge To
The Flange on Ceiling
Template
Vehicle
Front
FIG. 13B
Penguin Models Lay
Control Box Flat On Top
Of Ceiling Template
Vehicle
Front
3. Start each mounting bolt through the ceiling tem-
plate and up into the unit base pan by hand. Evenly
tighten mounting bolts to compress gasket to
1/2" this will be a torque of 40 - 50 inch pounds.
CAUTION
If bolts are left loose there may not be ad-
equate roof seal or if over tightened, damage
may occur to the air conditioner/heat pump
base or ceiling template. Tighten to specifi-
cations listed in this manual.
Installing unit with 3308120.XXX Genesis Air Filtration
System Return Air Kit Return Air Cover - continued on
page 14, column B.
Control Box
Three
Screws
Control Box
Two
Screws