DuraTrel Elmwood Trellis 11190 Instructions de montage - Page 3

Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} DuraTrel Elmwood Trellis 11190. DuraTrel Elmwood Trellis 11190 4 pages.

Lay out one 74" left post (part 1). Starting at bottom, insert one 22" top/bottom cross rail (part 3) and seven 22"
horizontal slat (part 4). Insert free ends of bottom cross rail and horizontal slats into 74" right post (part 2).
Weave one 66" vertical slat (part 5) through horizontal slats. Insert end into left hole of bottom cross rail.
Weave remaining 66" vertical slat (part 5) through horizontal slats opposite of left vertical slat. Insert end into right
hole of bottom cross rail.
Separate tops of posts just enough to insert remaining 22" top/bottom cross rail (part 3) into top routed hole of
each post.
Using two 1¼" screws per post, fasten together trellis. Be sure all parts are fully inserted into posts before
fastening. Using PVC, super or crazy glue; glue post caps onto posts.
Elmwood Trellis
3