APlusLift HW-10KBP Manuel d'installation et instructions d'utilisation - Page 11
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et instructions d'utilisation pour {nom_de_la_catégorie} APlusLift HW-10KBP. APlusLift HW-10KBP 16 pages. 2-post floor plate car lift 10,000lb capacity
Également pour APlusLift HW-10KBP : Manuel d'installation et d'utilisation (20 pages), Manuel d'installation et d'utilisation (20 pages)
DO NOT over tighten. Note: If one of the cables is tighter than the other, the carriage will go up uneven. These
should be tightened like a Banjo String or Fan Belt.
ADJUSTING & SYNCHRONIING THE CARRIAGES
•
One of the most important things to remember is not to tighten down one side more than the other. The key is to
tighten one side a half dozen turns then the opposite side a half dozen turns. After getting both cables equally tight(YOU
SHOULD BE ABLE TO MOVE THE CABLES ABOUT AN INCH BACK AND FORTH WITH SLIGHT PRESSURE
LIKE A FAN BELT OR A BANJO STRING) raise the lift all the way up by pressing the UP Button on the power unit. Do
not bottom the lift out at the top by holding down on the switch.
•
Raise the lift off the latch(lock) by pushing the power button, this will enable you to pull each release cable ring
located at the bottom of both carriages. See Figure 6. Pull down on the lowering valve handle(lever) on the power unit and
lower the lift all the way to floor. Raise the lift again and listen for the clicking of the safety locks in each column.
Determine which side is slower and tighten the adjusting bolt on the opposite side carriage. Remember to only tighten
a few turns at a time until the both locks click at the same time when raising the lift. Cycle the lift up and down. Repeat the
adjustment until the carriages are within a 1/4" of each other or the clicks are almost at the same time with each side. When
cables are adjusted properly they should be fairly tight.
DUAL POINT LOCK RELASE
FINAL ASSEMBLY
•
Check all bolts and nuts to make sure they are tight. Do not use an impact gun on concrete Anchors.
•
Check all fittings or leaks. If necessary, make sure the arm lock restraints are engaging properly and smoothly. If
not, tap the main lock forward or backward as needed with a rubber mallet to insure proper engagement on all 4 gears with
the arm restraint locks.
•
Cycle lift up and down to insure carriages are synchronized.
•
Place a vehicle on the lift and raise until swivel pads are contact with frame of the vehicle. Raise the vehicle about
3 feet and lower until the tires touch the floor. Keep raising and lowing the vehicle. Increase the height each time until the
Figure 6
11