APlusLift HW-10KBP-A Manuel d'installation et d'utilisation - Page 16
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} APlusLift HW-10KBP-A. APlusLift HW-10KBP-A 20 pages. 2-post floor plate car lift 10,000lb capacity
◦ Always the lift vehicle using all four pads.
◦ Never use the lift to raise one end or one side of a vehicle.
◦ Always raise the vehicle about 3" and check for stability by rocking the vehicle.
◦ Prior to lowering the vehicle, walk around the lift and check for any objects that
might interfere with the operation of the lift and safety latches; tools, air hoses, shop
equipment, etc.
◦ Always lower the lift to the lock position before going under the vehicle.
◦ Never allow anyone to go under the lift when raising or lowering.
The following periodic maintenance schedule is the minimum requirements at the minimum
intervals. Periodic maintenance is to be performed on a daily, weekly, and yearly basis.
WARNING!! OSHA AND ANSI REQUIRE USERS TO INSPECT LIFTING EQUIPMENT AT
THE START OF EVERY SHIFT. THESE AND OTHER PERIODIC INSPECTIONS ARE THE
USER'S RESPONSIBILITY.
FAILURE TO HEED THIS WARNING CAN RESULT IN PROPERTY DAMAGE, SERIOUS
INJURY, OR DEATH. IF YOU HEAR A NOISE NOT ASSOCIATED WITH NORMAL LIFT
OPERATION OR IF THERE ARE ANY INDICATIONS OF IMPENDING LIFT FAILURE,
CEASE OPERATION IMMEDIATELY! INSPECT, CORRECT, AND/OR REPLACE PARTS AS
NEEDED.
Daily Pre-Operation Check (8-Hours)
1. Check the safety lock audibly and visually while in operation
2. Check the safety latches for free movement and full engagement with the rack.
3. Check the hydraulic connections, and hoses for leakage.
4. Check the chain connection: cracks, bent, and loose links.
5. Check the cable connection: cracks, bent, and looseness.
6. Check for frayed cables in both raised and lowered positions.
7. Check snap rings at all rollers and sheaves.
8. Check the bolts, nuts, and screws and tighten if needed.
9. Check the wiring & switches for damage.
10. Keep the base plate free of dirt, grease or any other corrosive substances.
11. Check the floor for stress cracks near anchor bolts.
12. Check the swing arm restraints.
Weekly Maintenance (every 40-Hours)
1. Check the anchor bolts torque to 125 ft/lbs for the 3/4 inch anchor bolts. Do not use an
impact wrench to tighten the anchor bolts.
2. Check the floor for stress cracks near anchor bolts.
3. Check the hydraulic oil level.
4. Check and tighten the bolts, nuts, and screws.
Maintenance
16