Austin Hughes Infra Power ATS-H20US-15A_5-15P Manuel de l'utilisateur - Page 6

Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Austin Hughes Infra Power ATS-H20US-15A_5-15P. Austin Hughes Infra Power ATS-H20US-15A_5-15P 12 pages. Autom230v amp : 10a / 16a outlet : c13 / c19; 208v amp : 20a outlet : c13 / c19; 110v amp : 15a / 20a outlet : us nema

Austin Hughes Infra Power ATS-H20US-15A_5-15P Manuel de l'utilisateur
< 1.4 > Power Sources Connection
Step 1 : Before Power Source Connection
This Transfer Switch requires that the applied AC waveforms from
both power sources be in phase with respect to each other. Failure to
do so can potentially damage the unit and create an unexpected
to be present on the pins of either the Primary Source or Secondary
Source plug when disconnected, or on the Primary Source or Sec-
ondary Source output receptacles.
For questions concerning this requirement please contact
Austin Hughes Technical Support.
Step 2 : Power Source Connection
Plug the male end of the power cord into the AC power source.
Power Source Association
After the power source connection, the ATS input power LEDs ( primary & secondary input ) will indicate the
power ON / OFF status. Then slide the input preference switch to the primary input.
Primary
Input / LED
ON
OFF
ON
OFF
< 1.5 > Devices Connection
Step 1 : Before connect the devices to the ATS outlet, please keep the device's on / off
switch in the off position.
Step 2 : After connect the devices to the ATS outlet, please power on the device.
Step 3 : Fasten device's power cord to the cord retention tray with cable ties.
Do not exceed the ATS maximum current loads.
UM-IP-ATS-Q415V6
HIGH VOLTAGE
Secondary
Output
Input / LED
Power Source
ON
Primary
ON
Secondary
OFF
Primary
OFF
OFF
P.4
All electrical power and power control wiring
must be installed by a qualifi ed electrician and
comply with local and national regulations.
Don't exceed the outlet, branch or phase
limitations
www.austin-hughes.com