Dato LJCC2040A Manuel de l'utilisateur - Page 9
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} Dato LJCC2040A. Dato LJCC2040A 18 pages. Two post lift
3.2.3 INSTALLATION DRAWING OF POST
Notice: Drill hole withφ19mm aiguille and then anchor with pneumatic tools. The depth of hole and bolts
should be the same and insert the bolt. The air anchor, made against the washer to under the post. When
fastening to the use of torque wrench, do not use impact tools to tighten.
3.2.4 STEEL CALBE INSTALLATION
1 Fix the posts according to the drawing, and place the main
post, slave post according to picture 4. Drill hole for expansion
bolt withφ19mm aiguille and no need to fix the bolt at the
moment.
2 Check and ensure the posts dimension is in accordance with
picture 5. Test the vertical of post with spirit level (construction
using type).
3.2.5 ORIENTATION OF CROSSBEAM
1 Fix the crossbeam according to the drawing. That side
with limit switch should be installed on the post with
hydraulic unit, then fasten with screw.
2 Fasten the expansion bolt.
Notice: Select suitable steel shim as gasket and insert under the
post bottom, to make the post vertical. The thickness of steel shim
should less than 5 mm.
Oil pipe and accessory installation
3.2.6
1 Connect the oil pipe and cable through the oil pipe slot.
2 Fix the hydraulic station, then connect the oil
pipe fittings and wire plug.
Picture 6(oil pipe list and installation)
user's manual
Picture 4 (post installation)
Picture 5 (post orientation)
9
Chapter 3 Installation