Bretford MSB-F3 Instructions de montage - Page 3
Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} Bretford MSB-F3. Bretford MSB-F3 5 pages. Floor infeed liquid workspace
Steps to connect Floor Infeed to Channel Distribution Harness
Connect the open end of the Jumper to the
Floor Monument power(this has to be in-
stalled by a certified electrician). Place the
Support Unit over the Floor Monument and the
Infeed.
Note:
Top Cover
Support
Remove Top Cover by pulling it up and
save to reassemble.
STEP 1
Support must be bolted down when power infeed used.
Fig. 1
STEP 2
Channel