Gage Bilt GB902 Manuel - Page 5
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Gage Bilt GB902. Gage Bilt GB902 9 pages. Hydraulic powerunit
PRESSURE SETTING:
HYDRAULIC PRESSURE MUST BE SET BEFORE CONNECTING TOOL:
Ensure powerunit does not exceed recommended installation tool pressures. Adjust
hydraulic pressure for required pull pressure of tool being used (refer to tool manual).
NOTE:
Preset air regulator to approximate pressure.
90 psi = 8200 lb (not to exceed 110 psi) 10 psi of air is approximately equal to 1000 lbs of
hydraulic pressure.
1. Connect Hydraulic gage to pump.
2. Turn handle to -A- position.
3. Hold down foot pedal and read hydraulic gage.
4. Put handle in center (neutral) Position.
5. Adjust air pressure accordingly.
6. Repeat until correct hydraulic pressure is set.
OPERATION:
1. Put pump handle in center (neutral) position.
2. Connect tool to pump.
3. Connect air supply to pump.
4. Insert rivet into nose assembly.
5. Turn handle on pump to position -A-.
6. Hold down on foot pedal until rivet breaks then release pedal.
7. Turn handle to center position for 2 to 5 seconds to release hydraulic pressure.
8. Turn handle on pump to position -B-.
9. Hold down on foot pedal until tool is pushed off of rivet then release pedal.
10. Turn handle on pump to center ( neutral ) position.
CAUTION:
DO NOT exceed 110 psi air pressure.
5