Great Lakes GL24SRD Manuel d'instructions d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Great Lakes GL24SRD. Great Lakes GL24SRD 8 pages. 19" eia srd swing rack
Également pour Great Lakes GL24SRD : Manuel d'instructions d'installation (12 pages)

Great Lakes GL24SRD Manuel d'instructions d'installation
PREFACE
This manual is provided to prevent service personnel from committing an act
that results in the risk of fire, electric shock, or injury to persons. Only trained
service personnel should receive, unpack, and assemble the SRD Swing
Rack. In addition, only trained service personnel should install equipment in
enclosures.

SAFETY SYMBOLS USED IN THIS MANUAL

This manual provides general safety guidelines to be observed during
installation, operation, and maintenance of the SRD Swing Rack.
WARNING: Failure to follow directions in the warning could result in injury to
persons or loss of life.
CAUTION: Failure to follow directions in the caution could result in damage to
equipment or storage data.

SAFETY CONSIDERATIONS

WARNING: Improper handling and use of the SRD Swing Rack could result in
equipment damage, serious injury, or possible death.
Only UL® Listed ITE (Information Technology Equipment) units should be
installed inside the SRD Swing Rack.
Be sure to read and follow all individual manufacturer equipment manuals for
safety and installation instructions.
Proper spacing is required when installing electrical equipment to avoid
electrical shock.

INSTALLATION

Loading Equipment

WARNING: Only install equipment after the SRD Swing Rack has been properly
secured. Do not move the SRD Swing Rack assembly while loaded.
MAXIMUM LOAD CAPACITY: 100 pound capacity for every size of
SRD Swing Rack
2