Great Lakes GL48SR Manuel d'instructions d'installation - Page 9
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Great Lakes GL48SR. Great Lakes GL48SR 12 pages. 19" eia wall mount swing rack
Également pour Great Lakes GL48SR : Manuel d'instructions d'installation (8 pages)
Top/Bottom
Brace (QTY. 2)
Side Brace
Nylon Shoulder Washer
STEP 1
Attach the top and bottom brace to swing rack sides using the 1/4 - 20 x 1/2"
carriage bolts and 1/4 - 20 hex nuts.
STEP 2
Close swing frame and attach using the shoulder bolts.
STEP 3
Mount the assembly to the wall with four lag screws (these are not provided;
The installer is to determine correct hardware for the type of wall). Mounting
holes are designed for 3/8" hardwares, 16" on center.
1/4-20 Hex Nuts w/Serrated
Flanges (QTY. 8)
Socket Head Shoulder Bolts
with 3/8" - 16 Thread (QTY.4)
1/4-20 x 1/2" Lg.
Carriage Bolts (QTY. 8)
Socket Head
Shoulder Bolts
with 3/8"- 16
Thread (QTY. 4)
M6 x 12mm Copper Ground
Studs, (1) On Swing Frame
and (2) on Swing Brace
Swing
Frame
9