6KU TRACK Manuel de construction pas à pas - Page 11
Parcourez en ligne ou téléchargez le pdf Manuel de construction pas à pas pour {nom_de_la_catégorie} 6KU TRACK. 6KU TRACK 17 pages.
- 1. Table of Contents
- 2. Tools
- 3. Let's Get Started
- 4. Installing the Handlebar
- 5. Installing the Front Wheel
- 6. Aligning the Stem
- 7. Installing the Seatpost
- 8. Optimizing the Brake Pads
- 9. Preparing Pedals for Installation
- 10. Installing the Pedals
- 11. Pumping the Tires
- 12. Let's Finish up that Handlebar
- 13. Optional Fixed Gear/Freewheel
- 14. Contact Information
INFLATING THE TIRES
a.
First remove the valve cap.
b.
Then unscrew the presta valve nut.
c.
Now, insert your pump head onto
the presta valve and inflate your tire
between 90 - 100 PSI.
d.
Retighten the presta valve nut.
e.
Replace the valve cap.
f.
Repeat the same process on the rear
wheel.
10