Active Storage MVault Manuel de démarrage rapide - Page 7

Parcourez en ligne ou téléchargez le pdf Manuel de démarrage rapide pour {nom_de_la_catégorie} Active Storage MVault. Active Storage MVault 12 pages.

Shutting Down your mVault

The mVault is powered off using the dual power switches on the rear of the system.
The system is designed for 24/7/365 operation and rarely requires shutdown. In order to shut down your
mVault, you should follow the procedures outlined for your mRAID or ActiveRAID system.
WARNING: DO NOT POWER DOWN THE mVAULT BEFORE POWERING DOWN THE RAID – THIS MAY
RESULT IN DATA LOSS!
Replacing a faulty hard disk module
Faulty hard disk modules can be removed with the system powered on or off.
If you are powering down the system, carefully follow the power off procedures before beginning this
procedure.
CAUTION: IF THE SYSTEM IS ON DURING HARD DISK MODULE REPLACEMENT, ENSURE THAT NO
I/O ACTIVITY IS GOING TO THE mVAULT.
1. Remove the 4 front rack mounting screws from the system (fig.1a). Press the release tabs
inward (fig.1b) while carefully sliding the system from the rack.
2. Continue sliding the system out until the top access panel clears the equipment rack, then
continue sliding very slowly until the rails lock into the service position.
3. Pull up on the release handles on the top access panel and carefully open the top covers (fig.
2a).
4. Please refer to the instruction sheet on the inside of the top access cover for detail instruction
on removing and replacing a hard disk module (fig.2b).
RELEASE HANDLES
mVault I Quick Start Guide 2012 - v1.0
FRONT PANEL
SCREWS
fig. 1a
fig. 2a
mVault I
Quick Start Guide
RELEASE TABS
fig. 1b
fig. 2b
7