Great Little Trading Abbeville L1599 Manuel de démarrage rapide - Page 5

Parcourez en ligne ou téléchargez le pdf Manuel de démarrage rapide pour {nom_de_la_catégorie} Great Little Trading Abbeville L1599. Great Little Trading Abbeville L1599 9 pages. Storage - nine cube unit

STEP 1:
Working on a protective surface like a carpet or rug, you will be building this unit with
the front facing up.
Take note of the panel orientation guidance in the steps.
With the help of a second person, take 2x vertical divider panels E and hold in a
parallel formation with the slots facing up. The larger drill holes on both of these
panels are the 'top' of the unit, smaller holes are the 'base'
Ensure these drill
holes are pointing
towards the BASE
D
E
BASE
(Smaller holes
on Panel E)
Now slot 2x horizontal shelf panels D into panels E. Make sure the large drill holes
of the panels are pointing in the same direction to what will be the base of the unit
(smaller holes on panels E).
TOP
(Larger holes
on Panel E)
D
E
STEP 2:
Take both side panels B & C and insert 4x cam dowels (#4)
and 4x wooden dowels (#1) into EACH panel as shown.
#4
#4
2x #1
#4
5
Hardware for Step 2:
4x #1 Wooden Dowel
4x #4 Cam Dowels
#4
2x
#1
#4
#4
2x
#1
C
#4
#4
B
2x #1
#4