Great Little Trading Abbeville L3952 Manuel - Page 6

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Great Little Trading Abbeville L3952. Great Little Trading Abbeville L3952 6 pages. Long shelf unit
Également pour Great Little Trading Abbeville L3952 : Manuel (9 pages)

Great Little Trading Abbeville L3952 Manuel
Hardware for Step 7:
4x #1 Wooden Dowels
4x #2 Cam Dowels
#1
#2
x2
STEP 7:
Insert x4 wooden dowels (#1), and x4 cam dowels (#2) to top panel (E).
Hardware for Step 8:
4x #3 Cam Locks
#3
STEP 8:
Position top panel (E) onto the unit. Once in place, insert x4 cam locks (#3) into the
larger hardware holes and turn clockwise to secure the top panel in place. Ensure that
the ledged side of panel (E) is facing downwards.
#2
#1
#2
E
x2
#3
E
#3
x2
#3
STEP 9:
Carefully turn over the unit and attach the back panels (G &H) using x12 screws (#4).
Please note that the 2x pilot holes indicated at the top of the unit are to attach anti-
tip straps included separately with this item.
#2
#4
#4
Your unit is ready to use.
Attach the anti tip straps to the back of the unit using the remaining drill holes. For
details on securing the unit to the wall see the anti-tip kit guidance.
6
Great Little Trading Company and GLTC are registered trade marks of G.L.T.C. Limited.
#4
#4
#4
G
#4
#4
H
#4
#4
#4
Copyright© 2012 G.L.T.C. Ltd. All rights reserved.
Hardware for Step 9:
12x #4 Screws 12mmL