DAYLIFF AQUASTRONG SMART 45 Manuel d'installation et d'utilisation - Page 9
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} DAYLIFF AQUASTRONG SMART 45. DAYLIFF AQUASTRONG SMART 45 16 pages. Water boosting pump
4. OPERATION
4.1 Priming the pump
Unscrew the priming plug and pour atleast 1.2 litres of water into the pump.
4.2 Starting the pump
1. Open a tap to prepare the pump for venting.
2. Plug pump onto power and the pump will start shortly.
3. Allow water to flow out until it stops bubbling, when all the air is expelled,
close the tap.
4. Open the highest tap in the installation.
5. Adjust the pressure set point to required pressure by adjusting the buttons
on the control panel.
6. Close the tap.
7. The pump is ready for use.
4.3 Setting the correct pressure
The pump can be set between 1.0 to 5.5bar at intervals of 0.5bar. The factory
setting is 3bar.
The default pressure of 3.0 bar will suit most applications. The difference
between the inlet and outlet pressure must not exceed 3.5bar. Example: If the
inlet pressure is 0.5bar, the maximum outlet pressure should be 4bar. If the
pressure is set too high the pump will operate intermittently.
The difference between the inlet and outlet pressure
should not exceed 3.5bar.
NOTE
7