AirCycler g2-k Manuel de formation - Page 18

Parcourez en ligne ou téléchargez le pdf Manuel de formation pour {nom_de_la_catégorie} AirCycler g2-k. AirCycler g2-k 20 pages.
Également pour AirCycler g2-k : Manuel d'installation et d'utilisation (11 pages), Manuel de test d'installation (2 pages), Manuel de test d'installation (2 pages)

AirCycler g2-k Manuel de formation

7.0 INSTALLATION TESTING GUIDE

Testing the AirCycler® g2-k completed installation is an easy two step process:
STEP 1
Test the FanConnect
STEP 2
Test thermostat, damper and furnace connection and operation
STEP 1
a. With the thermostat off, turn on the FanConnect™
switch.
b. Confirm the exhaust fan is running
c. The AirCycler® g2 display should show the exhaust (bath)
fan is ON and the outside fresh air damper is open (OA)
d. Confirm the outside fresh air damper is open (OA icon)
e. Turn off exhaust fan
STEP 2
a. Make sure exhaust fan is off (delay time may be running and
EXH icon will show)
b. Turn thermostat FAN switch to ON
c. Confirm AirCycler® g2 display shows FAN and damper
open (OA).
d. Confirm furnace fan is running
e. Remove AirCycler® g2 from it's base. Furnace fan should
shut off
f. DONE! Replace AirCycler® g2 controller on it's base
connection & operation (if using FanConnect™ switch)
(tm)
EXH - EXHAUST
FAN IS ON
OA - FRESH AIR DAMPER
OA - FRESH AIR DAMPER
EXH
FAN ON FROM
THERMOSTAT
18
LCD DISPLAY
IS OPEN
PERCENTAGE OF VEN-
TILATION COMPLETE
IS OPEN
PERCENTAGE OF VEN-
TILATION COMPLETE
AC DOC 8.5
REV 7/2020