Gainsborough K532 Instructions de montage - Page 2

Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} Gainsborough K532. Gainsborough K532 3 pages. Solar trickling water feature

Solar Trickling Water Feature
Please read and retain these instructions for future reference
Switch settings
(Switch at the back of the solar panel)
Care and Maintenance Recommendations
1. Clean solar panel with a soft sponge every couple of weeks.
2. Make sure all connectors are still tight and no water getting in.
3. Keep the water clean during the summer keep topping up every 3 or 4 days with clean water.
4. Clean any pipes every month stop any build-up of algae which could put an extra pressure on your
pump.
5. Take out any foreign body around the pump and keep clean solar product.
6. Always make sure there is enough water for the pump to work otherwise you could damage the pump.
The Enterprise
Department
K532
UK Head Office, 11 Bridge Street, Bishop's Stortford, CM23 2JU
Tel: 0844 4824400*,
Fax: 01279 756595
www.coopersofstortford.co.uk
EU address: D.S.B. LD, 160 Bd. de Fourmies, 59100 Roubaix, France
Tel: (+44) 1279 701269
*UK Calls cost around 7 pence per minute plus your telephone company's network access.
Please check with your telephone supplier.
Instructions for Use
v001: 28/03/22