DBI SALA Hot Work NANO-LOK SRL 3101521 Manuel d'instruction - Page 13

Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} DBI SALA Hot Work NANO-LOK SRL 3101521. DBI SALA Hot Work NANO-LOK SRL 3101521 15 pages. Self retracting lifelines

DBI SALA Hot Work NANO-LOK SRL 3101521 Manuel d'instruction
Serial Number(s):
Model Number:
Inspection Date:
Component:
Diagram 1 — SRL Inspection
D
A
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Table 1 – Inspection and Maintenance Log
Inspection:
creating a slack line condition.
positive with no slipping.
for chemical or heat damage indicated by brown, discolored, or brittle areas.
splinters and slivers on the lifeline surface.
be no evidence of elongation and the cover should be secure and free of tears
or other damage.
Diagram 2 — Web Lifeline
C
A
Frayed
Welding
Inspected By:
Inspection Frequency
Cut
Date Purchased:
Date of First Use:
Diagram 3 — Load Indicator
Deployed and
Webbing
Pass
Fail
Cover