Emerson 781 Manuel de référence - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel de référence pour {nom_de_la_catégorie} Emerson 781. Emerson 781 13 pages. Smart wireless field link

Emerson 781 Manuel de référence
Reference Manual 
00809‐0200‐xxxx, Rev AA 
April 2010 
 
Wireless Considerations 
Power Up Sequence 
The Smart Wireless Field Link and Wireless I/O should be installed and functioning properly before the power 
modules are installed in any wireless field devices. Wireless field devices should also be powered up in order of 
proximity from the Field Link beginning with the closest. This will result in a simpler and faster network installation. 
Mounting Location 
The Field Link should be mounted in a location that allows convenient access to the host system network (wireless 
I/O) as well as the wireless field device network. 
Find a location where the Field Link has optimal wireless performance. Ideally this will be 15‐25 ft. (4,6 ‐ 7,6 m) 
above the ground or 6 ft. (2 m) above obstructions or major infrastructure. 
Figure 1.  Mounting Location 
 
  
 
 
 
 
 
Antenna Position 
The antenna should be positioned vertically, either straight up or straight down, and should be approximately 3 ft. 
(1 m) from any large structure, building, or conductive surface to allow for clear communication to other devices. 
Figure 2.  Antenna Position