HighPoint Thunderbolt TurboBox NA211TB Manuel d'installation rapide - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel d'installation rapide pour {nom_de_la_catégorie} HighPoint Thunderbolt TurboBox NA211TB. HighPoint Thunderbolt TurboBox NA211TB 3 pages. Expansion enclosure

HighPoint Thunderbolt TurboBox NA211TB Manuel d'installation rapide
Thunderbolt
4. Put  the  top  cover  back  and  tighten  the  thumbscrew.
Step  4
6.
Fan  Speed  Adjustment
To  adjust  the  fan  speed  of  80  mm  cooler  on  NA211TB,  pull  
the  fan  cooler  out.  On  the  top  side  of  cooler's  connector,  
there  are  five  sets  of  jumpers  labeled  4,  3,  2,  1,  and  F  from  
top  to  bottom.  The  default  setting  is  the  jumper  being  placed  
over  pin  5  and  pin  6  on  label  2  for  moderate  fan  speed.  
The  fan  speed  increases  from  label  4  to  label  F  
(F  is  full  speed).  If  all  pins  are  open  (no  jumper  placed  over  
pins),  the  fan  will  not  spin.
9
7
5
3
1
7.
Operation  and  Verification
The  following  verification  steps  are  for  Mac  OS  only.  
When  verification  steps  for  Windows  operating  system  
become  ready,  the  content  will  be  added.
1. Connect  TurboBox  with  power  source,  and  then  connect
TurboBox  and  HOST  with  Thunderbolt
Thunderbolt  cable
TM
PCIe Expansion Enclosure
2. The  NA211TB  is  designed  to  be  powered  on  and
powered  off  simultaneously  with  HOST  when  TurboBox
NA211TB  is  connected  to  HOST  by  Thunderbolt
Therefore,  power  on  HOST  first,  and  then  NA211TB  will
be  powered  on  automatically.  (NA211TB  supports  hot-­plug
and  hot-­unplug  for  powering-­on  and  powering-­off)
3. Verify  HighPoint  Thunderbolt
HOST.  Click  the  Apple  icon  on  top  left  of  the  screen,  and
select  About This Mac,  and  then  select  More Info.  Next,
select  System Report,  and  select  Thunderbolt
of  the  pane  of  System  Information.  Select  NA211TB  to see
information  about  HighPoint  Thunderbolt
10
8
6
4
2
TM
 cable.
iMac
TM
 cable.
TM
 target  card  is  recognized  by
TM
 on  left  side
TM
 target  card.
Step  3.1
Step  3.2
Step  3.3
Step  3.4
4. Verify  the  PCIe  cards  installed  inside  NA211TB.
After  seeing  information  on  HighPoint Thunderbolt
card, click  PCI Cards  on  left  side  of  the  pane  of
System  Information,  and  then  you  will  see  all  the  PCIe  cards
listed.  (For  RAID  controller  card,  from  starting  up,  it  will  take
more  time  for  its  info  to  be  shown)
5. Verify  the  drivers  of  PCIe  cards  are  installed.
When  you  see  all  the  PCIe  cards  listed  on  step  4,
there  will  be  a  column  Driver Installed  indicating  the
status  of  the  drivers  of  the  PCIe  cards.
If  the  status  shows  "No",  please  find  and  install  the
TM
-aware  driver  of  the  PCIe  card,  and
Thunderbolt
then the  status  will  show  "Yes".
6. While  TurboBox  NA211TB  is  connected  to  HOST  by
Thunderbolt  cable,  when  shutting  down  the  HOST,
the  NA211TB  will  be  shut  down  simultaneously  as  well.
If  you  have  any  further  questions,  please  contact  your  
regional  distributor,  or HighPoint Technologies,Inc
HighPoint Technologies, Inc.
Address: 1161 Cadillac Court, Milpitas, CA 95035
E-mail:
Phone:
(408) 240-6108 (Monday~ Friday, from 9am~6pm)
Skype:
Highpoint.Thunderbolt
Support: www.highpoint-tech.com/websupport
TM
 target