Galvin Engineering Flowmatic TZ-FLOWSENC24 Manuels d'installation - Page 4
Parcourez en ligne ou téléchargez le pdf Manuels d'installation pour {nom_de_la_catégorie} Galvin Engineering Flowmatic TZ-FLOWSENC24. Galvin Engineering Flowmatic TZ-FLOWSENC24 11 pages. Ss face plate w/ concealed 24v ac wall sensor
Product Installation Guidelines
INSTALLATION
Avoid common installation errors :
-
Non-compliance to Australian Standards.
1. Mount galvanised electrical box (not
supplied)
-
Mount galvanised box into the wall 1 or 2mm
below the finished wall surface.
The galvanised box can be fixed to a masonry
-
wall or wall frame using screws suitable for
the fixing method. (Fasteners to be supplied
by installer).
If more lead is required extension leads
-
are available. In this case please contact
Galvin Specialised
Note: For the galvanized box supply and
orders please contact Galvin Specialised
© Galvin Engineering Pty Ltd
(NOT SUPPLIED)
-
No access for service.
2. Connect to sensor plug
−
We recommended that all cabling is fed through
25mm conduit to make servicing and
replacment easier.
−
Connect the transformer plug to the rear of the
Sensor, observing the correct plug connection.
−
If more lead is required extension leads are
available. In this case please contact Galvin
Specialised.
Do not cut the leads. If the leads are too long, it
is recommended that any excess is coiled up
and clipped to the wall.
Version 1.1, 30 April 2021, Page 4 of 11