Mainpine EPC Manuel d'utilisation - Page 15

Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation pour {nom_de_la_catégorie} Mainpine EPC. Mainpine EPC 16 pages. Charging controller

6
SERVICE & MAINTENANCE

6.1 REPLACING THE DEVICE

MAINTENANCE
The Mainpine EPC charging controller is maintenance-free .
:
WARNING
THERE ARE NO USER-REPLACEABLE FUSES WITHIN THE EPC
MAINPINE EPC CHARGING CONTROLLER REPLACEMENT
REQUIREMENT: Ensure that the plant and the device itself are de-energized .
:
DANGER
VOLTAGE HAZARDS
Contact with live components can result in serious injuries . Disconnect the system and all devices from the power supply before
starting work .
PROCEDURE:
1. Disconnect the wiring from all EPC connector terminals .
2. Disassemble the device by pulling the locking slider on the back of the device down and swivel the device away from the DIN rail and
remove it .
3. Install the new device by clipping the top locking guide onto the DIN rail and swinging it down until the locking slider clicks into place .
4. Reconnect the wiring .
5. Switch on the power supply for the device and the main power for the unit feeder again .

6.2 CLEANING

Cleaning of the device is not intended or permissible .
.
15